Road work resumes on Highway 34

The following information was shared from Dane Parrish, project manager with Concrete Technologies, Inc.
 
Our paving operation is planned to begin Thursday, Aug. 22 at the West end of the project working our way East.  Our first pave will be from 48 to 4th St and the trucks will be coming into the project via 4th St.  this will create some congestion but we should be able to manage to keep the road clear for traffic.  As we move past 4th St we will start bringing trucks into the job site at 8th St.  when this happens we will be temporarily closing 8th St as a safety precaution.  Most likely this shutdown will only be for 6-7 hrs on Friday.
 
  • Traffic WILL be allowed to go east/west on Highway 34.
  • On Thursday (morning/day) and Friday morning, traffic will NOT be able to turn north onto 8th Street off of Highway 34 or turn south on 8th Street onto Highway 34;they hope to open it back up in the late afternoon/evening on Thursday and after noon on Friday.
  • 4th Street will remain closed (although they will be entering 4th to get in between Senate and the barricades – it will remain closed to traffic and they will put up some cones or point person).

 

The Red Oak Express

2012 Commerce Drive
P.O. Box 377
Red Oak, IA 51566
Phone: 712-623-2566 Fax: 712-623-2568

Comment Here